Construction loans work differently from loans on finished buildings. A finished building produces rent that can pay the loan. A building under construction produces no rent yet, but interest still comes due every month. That gap is why many construction loans include an interest reserve, a pool of money set aside at closing and used to pay interest while the project is being built.
An interest reserve is not extra cash for the borrower to spend. It is a dedicated part of the loan, held back for one purpose: paying interest during the construction period. Each month, instead of the borrower writing a check for interest out of pocket, the lender draws the interest payment from the reserve. The borrower still owes that interest, and it still counts as part of the loan, but the timing of the cash changes in a way that matches how a construction project actually runs.
Why lenders require a reserve
From a lender point of view, the risk in a construction loan is highest before the building is finished and leased. During that period there is no operating income, the collateral is incomplete, and the borrower is spending heavily on construction. If the borrower also had to fund monthly interest payments out of pocket during that same period, the cash strain would be severe, and a temporary cash squeeze could put an otherwise sound project in trouble.
A reserve solves that timing problem. It gives the lender confidence that interest will be paid on schedule even while the project earns nothing, and it gives the borrower breathing room to focus cash on construction. The lender is not giving the borrower a break on interest. The lender is making sure the interest gets paid from a source that is already funded and already under the lender control.
How the reserve is sized
Sizing a reserve starts with a simple question: how much interest will come due between closing and the point when the building starts producing income? The answer depends on the loan amount, how quickly the loan is drawn, how long construction is expected to take, and when the building is expected to be leased or sold. A longer build means more months of interest. A faster draw schedule means a larger loan balance earning interest sooner.
Lenders build in a cushion for delay. Construction schedules slip for weather, permits, material deliveries, and contractor problems. A reserve sized only for a perfect schedule would run out at the first delay, which is exactly when the borrower can least afford an out of pocket payment. A realistic reserve assumes the schedule will not go perfectly and leaves room for the project to finish late without running dry.
Borrowers should read the sizing assumptions closely. Ask what construction timeline the reserve assumes, what draw pace it assumes, and what happens if the project runs past that timeline. A reserve that looks generous on paper can still fall short if it assumes a build finishes months sooner than the contractor schedule suggests.
How draws from the reserve work
Each month during construction, interest accrues on the amount of the loan that has actually been drawn, not on the full loan amount. Early in the project, when only a small part of the loan is outstanding, the interest bill is small. As construction advances and more of the loan is drawn, the balance grows and so does the monthly interest. The reserve is drawn down in step with that pattern.
The mechanics are usually handled by the lender. The lender calculates the interest due, pays it from the reserve, and reports the remaining reserve balance to the borrower. The borrower should track that balance every month, because the reserve is finite. When it runs out, interest payments become the borrower responsibility, whether the building is finished or not.
That transition is the moment borrowers most need to plan for. If the reserve runs out before the building produces income, the borrower must fund interest from other cash. Knowing the expected burn rate of the reserve, and watching the remaining balance against the construction schedule, lets a borrower see that moment coming instead of being surprised by it.
What the reserve does not cover
An interest reserve covers interest, and only interest, during the construction period. It does not cover construction cost overruns, it does not cover operating expenses after completion, and it does not cover loan fees. Those costs need their own funding. A borrower who treats the reserve as a general cushion will find it gone sooner than expected, because every dollar drawn for interest is a dollar that is no longer available for future interest.
The reserve also does not extend the loan. When the construction period ends, the loan still needs to be repaid, refinanced, or converted to permanent financing on the schedule in the loan documents. The reserve only manages interest during construction. The exit from the construction loan is a separate question, and it deserves its own plan long before construction ends.
Questions to ask before closing
Before closing a construction loan with an interest reserve, ask how the reserve was sized and what assumptions went into it. Ask what happens if construction runs long and the reserve runs out. Ask whether the reserve can be increased if the schedule changes, and what that would cost. Ask how the lender reports the remaining balance and how often you will see it.
Ask also about the draw process for construction funds itself, because the pace of construction draws drives how fast interest accrues. For a plain explanation of how construction draws are reviewed and released, read: Commercial Construction Loans: How the Draw Process Really Works.
Finally, ask about the path after construction. A reserve that carries you through the build is only useful if there is a realistic plan for what comes next, whether that is leasing up and refinancing or selling the finished building. For a realistic sense of how long a commercial closing can take from application to funding, read: How Long Does It Take to Close a Commercial Real Estate Loan?.
Common mistakes to avoid
The most common mistake is treating the reserve as free money. It is borrowed money, it accrues as part of the loan balance, and it must be repaid like the rest of the loan. A borrower who forgets that can be surprised by the final loan balance at completion.
The second mistake is ignoring the reserve balance until it is nearly gone. The balance should be reviewed every month alongside the construction schedule. If the project is behind schedule and the reserve is burning faster than planned, that is a problem to raise with the lender early, while options still exist, not at the moment the reserve hits zero.
The third mistake is building a budget that assumes the reserve covers more than interest. Cost overruns, change orders, and leasing costs all need separate funding. A budget that quietly leans on the reserve for those items will fail twice: the reserve will run out early, and the overruns will still be unpaid.
The bottom line
An interest reserve is a timing tool. It matches interest payments to the period when a project has no income, by setting money aside at closing for that exact purpose. Sized realistically, tracked monthly, and paired with a clear plan for what happens after construction, it lets a borrower build without funding interest out of pocket during the hardest cash stretch of the project. Understand how your reserve was sized, watch the balance as you build, and plan the exit before you break ground. For what else a lender examines beyond the numbers on a single deal, read: What Lenders Actually Look at in a Commercial Loan Application.